Skip to navigation
Skip to Contents
Skip to Accessibility Statement
Menu
Home
Project Overview
Tunnel History
Document Library
Project Overview
Current Work
FAQ
Monthly Status Report
Document Library
Highway 99 Bus-on-Shoulder
Bridgeport Road Bus Connection
Highway 99 & 17A Off-Ramp
Document Library
Contact the Program
News Releases
Newsletter
Document Library
Highway 99 Tunnel Program Document Library
Document Library for all projects within the Highway 99 Tunnel Program.
Business Case and Supporting Materials
Business Case and Supporting Materials
Fact Sheet – GMC Business Case Overview
GMC Business Case
Appendix A – Summary ITR Recommendations
Appendix B – Discussion Paper – Rapid Transit Review
Appendix C – Crossing MAE
Appendix D – Description of the Options
Appendix E – Alternatives Screening Summary
Appendix F – GMC Regulatory Path Briefing Note
Appendix G – Crossing Procurement Options Report
Appendix H – Crossing Costing Report
Appendix I – CI Cost Report – Steveston Interchange
Appendix I – CI Cost Report – Transit and Cycling Improvements
GMC RRC – Guidelines for Establishing Ethical Dividers
GMC RRC – MOTI Protocol for Consultants on Projects
GMC RRC – Relationship Review Process Description
George Massey Crossing Assessment – Existing Tunnel
New project announcement (August 2021)
New project announcement (August 2021)
George Massey Crossing Technical Briefing
George Massey Crossing Brochure
Procurement Resources (June 2021)
Procurement Resources (June 2021)
Guidelines for Establishing Ethical Dividers
MOTI Protocol for Consultants on Projects
Relationship Review Process Description
Steveston Interchange RFP proponents contact information
Proposed Corridor Improvements (February 2021)
Proposed Corridor Improvements (February 2021)
EAC Amendment and Proposed Corridor Improvements
EAC amendment process
Existing George Massey Tunnel Replacement EAC
Public Information Materials (February 2020)
Public Information Materials (February 2020)
Display Boards
Handout
Fly-through animation – Bridge
(Artistic rendering and subject to change)
Fly-through animation – Tunnel
(Artistic rendering and subject to change)
2019 Engagement Summary Report
Technical Services Report (December 2019)
Technical Services Report (December 2019)
Executive Summary
Appendix A: Feasibility of Continued Use of Existing Tunnel
Appendix B: Bored Tunnel Technical Summary
Appendix C: Immersed Tube Tunnel Technical Summary
Appendix D: Long Span Bridge Technical Summary
Appendix E: Geotechnical Summary
Appendix F: Environmental Technical Summary
Appendix G: Preliminary Hydrotechnical Summary
Appendix H: Traffic and Geometrics Technical Report Part 1
Appendix H: Traffic and Geometrics Technical Report Part 2
Appendix H: Traffic and Geometrics Technical Report Part 3
Appendix H: Traffic and Geometrics Technical Report Part 4
Appendix I: Examples of MUPs in Tunnels
Appendix J: Estimated Range of Project Costs
Appendix K: Renderings
Environmental Input to GMC Multiple Accounts Evaluation (December 2019)
Task Force Meeting Presentation – Highres Part1 (October 2019)
Task Force Meeting Presentation- Highres Part2 (October 2019)
Task Force Meeting Presentation (October 2019)
Principles, Goals and Objectives (June 2019)
Preliminary Long-list of Options (June 2019)
Evaluation Framework (MAE) (June 2019)
Technical Briefing December 2018
Independent Technical Review September 2018
Independent Technical Review Terms of Reference